Mission Dist. centered at Folsom and 17th St. extending from Shotwell and 18th down to Harrison and 14th.
This area floods about every other year on average. Flooding events initiate at the manholes at the intersection of Folsom and 18th and Folsom and 17th sts. due to flow constrictions in the Treat St. sewer and further downstream in the Division St. sewer system. The 18th st. system from Eureka Valley and the 17th/Church/Scott street system draining Cole Valley, the Panhandle and the Castro district were upgraded in the 1950s and together produce approx. 1000cfs. The Treat St. sewer which these sewers discharge to can carry approx 450cfs which explain why that area is the first and most frequently impacted. Further downstream The Division St. sewer downstream is limited to about 1200cfs from 9th st. to the Division St. outfall confluence structure but the Mission dist. sewers along with the 9th. st sewer which drains the Western Addition areas and east SOMA combine to approx 1700CFS or 50% under the upstream sewer capacity. This area is already covered by the 2021 Cleanup and Abatement Order (CAO) however it appears that SFPUC is dragging its feet on this project and is not likely to meet the schedule agreed upon by the CAO. This is not due to construction or permitting difficulties but instead by a lack of executive willpower to ensure compliance.
How to fix it:
How to fix it: